A hydraulic compaction wheel mounts in place of the bucket and compacts trench backfill in 6-8 inch lifts. Eliminates the need for walk-behind plate compactors and dramatically speeds utility line backfill.
Best applications
- Utility trench backfill (water, gas, electric)
- Pipeline backfill
- Foundation backfill
- Roadway subgrade preparation
ROI
Typical compaction wheel costs $8-15k. Replaces 1-2 labourers operating plate compactors. Pays back in 200-400 hours of trench work — under a year for most utility contractors.