Mozambique's Rovuma Basin LNG developments — TotalEnergies' Mozambique LNG at Afungi, ExxonMobil's Rovuma LNG, and Eni's Coral South FLNG — represent one of the largest construction programmes ever undertaken in southern Africa.
Equipment configurations for LNG construction
- 30-40 tonne mid-heavy crawlers for site preparation and earthworks
- HAZOP-rated cab safety packages for hot-work zones
- Reinforced undercarriage for sustained operation
- Hydraulic breakers for hard-ground areas
- Long-reach variants for pipeline and pile-cap excavation
Logistics into Cabo Delgado
Equipment for the Afungi peninsula projects ships via Nacala port (Cabo Delgado), then trucks south to project sites. Lead times can extend to 10-14 weeks due to the inland transport leg and security considerations.